|
|||||||||
|
Floor PreparationsPreparation of site. The Most important aspect of a good installation. we offer anpa on site survey backed up by all the major screed and DPM manufacturers with capabilities to shot blast, hand or pump screeds, plywood overlay to any site conditions. We can offer a design service from the initial thoughts to the end product
for bespoke Axminster in any quality or width, followed by a hand trial
of the chosen design and colour, to a full size print out of design. When it comes to specifying we have a extensive library of all types of covering suitable for areas from a small office to a full department store. Project management we project manage all our sites from within the company knowing that it is imperative that all contract hand over on time.
|
||||||||
Trevor Wharton
Contracts, 1 Ramshill Road, South Cliffe, Scarborough, YO11 2LN, UK |
|||||||||